Mass-DOT issues advisory for inspection of Braga Bridge

Massdot Formal Logo2

FALL RIVER, Mass. (WLNE) – The Massachusetts Department of Transit (Mass-DOT) has announced inspection work on the Braga Bridge that takes I-195 over the Taunton River in Fall River and Somerset from 9:00 a.m. to 1:00 p.m. on Monday, December 27.

Right lane closures and Breakdown lane closures will be required on I-195 eastbound. Appropriate signage, details, and messages will be in place to guide drivers. Drivers should expect delays, slow down, and drive with caution.

All work is weather dependent and can change without notice.

For more information on traffic conditions, visit Mass511 here or call them at 5-1-1.

Categories: Fall River, Massachusetts, News, Regional News