Roadblocks to be used on Braga Bridge for maintenance Thursday night

FALL RIVER, Mass. (WLNE) — The Massachusetts Department of Transportation said a crew will be performing maintenance and debris removal along the curbs on the Braga Bridge Thursday night.
MassDOT sat that the work is scheduled to begin at 9 p.m. and is expected to conclude by 5 a.m. Friday morning.
Rolling roadblocks will be in place in both directions of traffic and will impact the right and left lane and ramps.
Drivers travelling through the area should slow down and expect delays.
More information on traffic conditions and road work can be found on Mass511.