Braga Bridge work to result in lane closures

FALL RIVER, Mass. (WLNE) — The Massachusetts Department of Transportation (MassDOT) will perform scupper cleaning on the Braga Bridge this weekend, which will require some lanes to be closed.
The work will be performed from 9 p.m. on Sunday, September 29 to Monday, September 30 at 5 a.m.
The work will include some on/off ramps, and will be done on both the eastbound and westbound side on I-195.
Delays should be expected in the area of the work.