RIDOT announces lane closures on Route 113 bridges over I-95 and I-295 in Warwick

Rhode Island Department of Transportation.

WARWICK, R.I. (WLNE) — The Rhode Island Department of Transportation said there will be lane closures on both directions of Route 113 over I-95 and I-295 starting on Feb. 21.

According to RIDOT, the lane closures mark the beginning of the replacement of the bridges.

During construction, the left lanes in both directions of Route 113 will be closed.

The traffic pattern is expected to be in place until the middle of spring, which will then mark the start of the demolition and reconstruction of the other side of the bridge

The second phase of the replacement is expected to take place from mid-summer to late fall.

All travel lanes are expected to return to normal by the end of the year.

Categories: News, Rhode Island, Warwick